hope valley

You are currently browsing articles tagged hope valley.

When my sister-in-law first asked me to make this quilt, she knew that the couple she was giving it to was moving across the country from Boston (where they had all gone to medical school together) to San Francisco.  I asked if she had any requests or ideas, and she said it might be nice if it could remind them a little bit of their time in Boston.

Visions of lobsters, baked beans, and novelty Red Sox prints ran through my mind, and I shuddered.  What would make a quilt say “Boston?” I mean, I’m sure there are some neat colonial designs out there, but that’s not really my cup of tea any more than fabric with sports logos on it.  So I sat and I sat and tried to think of something, and I procrastinated and put it off.  And then, unsurprisingly, inspiration came via Ashley.  Her “Postcards from the Park” quilt reminded me of something – Cobblestones.  It instantly reminded me of one of Boston’s most iconic neighborhoods, Beacon Hill.  I knew what to do.

Cobblestones

I had also been gathering a whole bunch of Hope Valley, which I admit to not loving at first, but it slowly grew on me.  And there was something about it that said “California” to me.  No, not in the sense of present-day Hollywood or Silicon Valley.  Something almost pioneer-like, about moving West for a new life.  Maybe I’m the only one, but it works in my head.

And so, we have these very subtly wonky bricks that remind me of those old, imperfect, bumpy streets and sidewalks here on the East Coast.  The wonkiness is more subtle than I had pictured it in my mind, almost to the point that I worry someone would just look at it and think, “can she just not sew quite right?”  But I’m happy with it, and I still think it gives it a softly (intentionally) imperfect feeling.

Cobblestones

There are 16 prints from Hope Valley in this quilt, and no fewer than 12 solids (13 if you count the sashing).  Because I’m the kind of person who would want to know these things, the solids are: zucchini, raisin, deep rose, sweet pea, teal blue, stone, plum, sage, rose, amber, moss, and eggplant (all Kona).  Sashing/border is Kona Snow.  I am on a HUGE solid kick right now, and have a new favorite color every day.

Cobblestones

The backing is Kona Stone, with a strip of bricks.  Again with the solid kick, especially with backings.  Be prepared to see a similar theme through the next few finishes.

Cobblestones

I was nervous to do it for the first time, but ultimately decided to go for large pebbling when I quilted it, and I’m glad I did.  I went through some frustration with running out of thread, regretting a cheap substitute, and needing a new needle before I thought I would. And when I first started, I worried that I was totally ruining the quilt by practically scribbling on it with thread.  But the effectiveness is in the whole picture, not in each individual pebble, and I do think I love it.

Cobblestones

My husband, of all people, gets credit for the scrappy binding.  I really wasn’t sure what to do, and he was the one who suggested bits and pieces. And wouldn’t you know, he was totally right. I love it, especially the way it looks against the back.

And so, it is finished.  Just in time for the wedding, just in time for Finished for Friday, and just barely under the gun for Amy’s Spring Quilt Festival. Wohoo!

The only sad part about always making quilts for other people is that I rarely get time to sit and savor the finished product.  That is most definitely the case with this one, as I took the photos at about 6AM, it goes with my husband to work this morning to make the handoff to his sister, and tonight it flies to the other side of the country.  And that’s why, even if I wasn’t blogging them, I’d have to take pictures of every quilt I make!

Cobblestones

Tags: , , , ,

My sister-in-law leaves for San Francisco tomorrow evening. She probably asked me to make this quilt for her soon-to-be-married friend about six months ago.  I’m almost done.

Almost done...

Quick poll, though, it needs a name! I’m trying to be good about naming my quilts this year, but am not terribly creative.  So I’d love to hear if any of you can come up with something better.  I’m not going to show a full picture until it’s finished (tomorrow!), but here’s some info for your naming task:

  • It is all Hope Valley (with coordinating solids)
  • The pattern is slightly-wonky bricks, inspired by this quilt.
  • I did a large pebbling design for the quilting.
  • It is a gift for a couple about to be married (this weekend!).  They:
    • are both doctors (residents)
    • have recently relocated from Boston to San Francisco

So… any good names jump out at you?  Gotta make the label tonight so it can go in the wash before delivering it tomorrow! Yikes!

Tags: ,

So. Spring to Finish. It’s going…. well…. it’s going. Let’s check the white board shall we?

Spring to Finish - Progress

Yes, I have a white board in my sewing space to help me keep track, and it is vaguely color-coded in the status column. I’m a geek. Roll with it.  Black ink usually means I haven’t quite started.  Green means the fabric is at least cut, and I’m probably working on blocks. And red means FINISH THE DAMN THING ALREADY.  There’s a lot of red on there right now, and it’s freaking me out just a little.

I’ve got one complete finish, the quilt for my cousin’s daughter.  Admittedly, by the time I even put it on the list, the binding was nearly on. But still, it’s a finish. Check!

All of the mini pinwheels were totally worth it for my Pinwheel Sampler, the top for which is complete, and the backing is planned and fabric mostly cut.

Big-kid bed quilts for my kids have come together very quickly. Or, at least, the tops have.  Lots of wide sashing made it big enough without having to do a bajillion individual blocks.

Spring to Finish - Progress

So, that leaves me with three flimsies.  Three red statuses.  Two of which feel like they need to be done rather soon, since they’re for the big-kid beds, the transition to which is rapidly approaching. Excuse me while I go have a small heart attack.

Spring to Finish - Progress

Speaking of heart attacks – you’ll notice that the Cobblestone quilt has a green status on the board.  Not red. Not a completed top. You may also notice it has the most specific (and earliest) due date.  That’s a problem, since the current progress on it looks like this:

Spring to Finish - Progress

I’ve really been procrastinating on this one, for a number of reasons, and it’s getting to a rather critical point.  The extra crafting for Mother’s Day didn’t really help the situation, nor did having my in-laws staying in our guest room (aka my sewing room), meaning I did not have access to my machine for a solid two days.  Eeek!  Gotta get cracking.

And please, don’t even ask me about my Bee blocks. But it’s not the end of May yet, so they can’t be overdue, right?  Except, you know, that one left over from April. Sigh…

Tags: , , , , , , , ,